How should the organisation of the site and operation areas be done?

The use demolition carriers require a specific site organisation to ensure the area is safe and to stablish the conditions which must maintained during the whole job for the safe developing of the
demolition activities.

Such site organisation must take into account the following aspects:

  • Provide pathways and accesses allowing safe loading and unloading of the machinery along with reassembling and general maintenance on site.
  • The operation area for the machine must be sufficiently spacious to carry out the demolition job in a safe way.
  • If it is necessary to build access ramps, ensure that adequate space is available.
  • A parking place for the machines must be provided, where is it safe to attach the tool.
  • When surveying the site and operational areas, take into account that physical obstacles and utilities must be safeguarded (e.g. overhead power lines, other buildings which are not subject
    to demolition, sewages, gas lines, etc.).
  • Throughout the demolition, materials arising must be progressively cleared to ensure the work area around the base machine is kept clear and tidy.

Links:

Consult the full guide here:


Help us grow!

If you have any suggestions about these contents, find any error or would like to make us aware of anything, please fill out the form below.

To contact EDA, please fill in and submit the following form.

By submitting the form, you will automatically receive an e-mail with a copy of your request